{"id":33818,"date":"2023-07-03T00:01:40","date_gmt":"2023-07-02T23:01:40","guid":{"rendered":"https:\/\/www.ispreview.co.uk\/?p=33818"},"modified":"2023-07-03T15:08:29","modified_gmt":"2023-07-03T14:08:29","slug":"summer-2023-bduk-update-on-uk-project-gigabit-broadband-build","status":"publish","type":"post","link":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html","title":{"rendered":"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build"},"content":{"rendered":"<p>The <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/bduk\" target=\"_blank\">Building Digital UK<\/a> agency has published their latest quarterly update (June 2023) on the Government&#8217;s \u00a35bn rural <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2021\/03\/gov-starts-gbp5bn-uk-gigabit-broadband-and-voucher-schemes.html\" target=\"_blank\" rel=\"noopener\">Project Gigabit<\/a> broadband rollout progress, which has so far awarded rollout contracts worth a total of \u00a3589m (state aid) to help extend coverage to an extra 378,450 of the hardest to reach premises.<!--more--><\/p>\n<p>The project aims to extend networks capable of delivering &#8220;<em>gigabit<\/em>&#8221; (1000Mbps) download speeds to &#8220;<em>at least<\/em>&#8221; 85% of UK premises by the end of 2025 and then &#8220;<em>nationwide<\/em>&#8221; coverage (c.99%) by around 2030 (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2021\/11\/gov-targets-universal-uk-gigabit-broadband-coverage-for-2030.html\">here<\/a>). The funding released for this will depend upon how the industry responds, but so far around <strong>\u00a31.4bn<\/strong> worth of procurements and contracts are already in the pipeline (more is expected to follow).<\/p>\n<div class=\"bq2\"><strong>NOTE:<\/strong> The project is technology neutral, thus operators can use <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/fttp\">FTTP<\/a> (preferred), Hybrid Fibre Coax (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/docsis\">DOCSIS<\/a> 3.1+) or fixed wireless (e.g. <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/5g\">5G<\/a>) to plug the gap.<\/div>\n<div align=\"center\"><img decoding=\"async\" class=\"ngg-singlepic ngg-none\" style=\"padding: 0px; width: 100%;\" src=\"https:\/\/www.ispreview.co.uk\/wp-content\/gallery\/2023-uk-internet-statistics\/Project-Gigabit-BDUK-Coverage-Forecast-June-2023.png\" alt=\"Project-Gigabit-BDUK-Coverage-Forecast-June-2023\"><\/div>\n<p>At present, over 76% of UK premises can already access a gigabit-capable network (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/2023-h1-uk-full-fibre-broadband-coverage-rises-to-53-percent.html\">details<\/a>), which falls to 53% when just looking at <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/fttp\">FTTP<\/a> (i.e. the gigabit figure is boosted by <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/vm\" rel=\"nofollow\" target=\"_blank\">Virgin Media<\/a>&#8217;s HFC upgrade &#8211; <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2022\/07\/2022-h1-uk-coverage-of-gigabit-broadband-nears-70-percent.html\">here<\/a>). But <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/ofcom\" target=\"_blank\">Ofcom<\/a> currently forecasts gigabit coverage to hit 92% by March 2025 (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2022\/12\/ofcom-gigabit-broadband-covers-70-of-uk-as-5g-hits-67-77.html\">here<\/a>), with purely commercial deployments alone being expected to deliver over 80% of that.<\/p>\n<p>Project Gigabit is thus designed to focus on improving connectivity for those rural and semi-rural areas in the final 20% (<strong>5-6 million premises<\/strong>). This consists of several support schemes, including gigabit vouchers (\u00a3210m), funding to extend <strong>Dark Fibre<\/strong> around the public sector (\u00a3110m) and gap-funded deployments with suppliers (rest of the funding) &#8211; better known as the <strong>Gigabit Infrastructure Subsidy<\/strong> (GIS) programme.<\/p>\n<p>Today\u2019s article is focused upon the GIS programme and related procurement work, which sees ISPs bidding through a new <strong>Dynamic Purchasing System<\/strong> (DPS) to extend their networks across disadvantaged parts of the UK.<\/p>\n<h3><span style=\"color: #339966;\"><strong>What&#8217;s New in the June 2023 Update<\/strong><\/span><\/h3>\n<p>Since the last update on 27th Feb 2023 (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2023\/02\/winter-2023-update-on-project-gigabit-uk-broadband-rollout.html\">here<\/a>), BDUK has followed their initial contract awards by signing six new contracts in Cambridgeshire, the New Forest, North Shropshire, Norfolk, Suffolk and Hampshire &#8211; worth a combined \u00a3425 million (expected to help upgrade up to 284,000 hard-to-reach homes and businesses).<\/p>\n<p>The combined value of all the contracts signed so far comes to around \u00a3589m in public investment and will upgrade 378,450 premises (c.\u00a31,557 per premises passed). But the total value of all the Project Gigabit procurements launched to date (inc. those that have yet to be awarded) is around \u00a31.4bn, which could see up to 895,000 extra premises being passed by a gigabit-capable network.<\/p>\n<p>Elsewhere, BDUK also completed their initial analysis of the major English metropolitan areas, which has helped them to identify the &#8220;<em>small pockets of poor urban digital connectivity [that] will remain unserved by the commercial market without government intervention.<\/em>&#8221; In order to accurately ascertain how to best serve these premises, BDUK has chosen to pause their procurement timeline in related areas and engage the market, councils and other local stakeholders on the most suitable solutions.<\/p>\n<p>In addition, BDUK&#8217;s market engagement in Essex and East Surrey has revealed significant planned commercial activity, leaving only a limited number of premises eligible for subsidy. The market has shown limited interest in bidding for what would be smaller-sized procurements in these areas, and so they&#8217;re now considering alternative interventions.<\/p>\n<p>Finally, as part of ongoing work to refine the ways they use public funding to serve &#8220;<em>uncommercial sub-gigabit premises<\/em>&#8220;, BDUK are now considering the use of smaller, more flexible contracts to target sub-gigabit gaps in the network which the market may leave behind. &#8220;<em>We are at an early stage, and will consult the market in detail on this new route to market in due course<\/em>,&#8221; said BDUK.<\/p>\n<p>However, so far most of the Project Gigabit contract awards have been for England, while the devolved countries of Wales, Scotland and Northern Ireland are still in the preparation stage. But we do get a good idea of the next steps for these areas.<\/p>\n<div class=\"bq2\"><strong>NOTE:<\/strong> Project Gigabit in England is centrally managed (by DSIT\/BDUK \u2013 not local councils), while the details on how the scheme will work in Scotland, Wales and Northern Ireland are still TBA.<\/div>\n<blockquote><p><span style=\"color: #339966;\"><strong>Status of Devolved Countries<\/strong><\/span><\/p>\n<p>\u27a4 <strong>Wales<\/strong><\/p>\n<p>Areas across North West Wales, Mid Wales and South East Wales will be included in a cross regional procurement [Type C] we plan to launch in the summer. In addition, we are planning to launch a regional procurement in North Wales by the end of the year, and we are finalising the most appropriate approach for South West Wales.<\/p>\n<p>Type C procurements will appoint a single supplier to target premises (i.e. subsidise the design, build and operation of a new gigabit network) in areas where no or no appropriate market interest has been expressed before, or areas that have been descoped or terminated from a prior plan.<\/p>\n<p>Active voucher projects continue to deliver in Wales, but the scheme remains paused for new projects as the intervention areas for procurement are finalised. As of the end of May 2023, we had connected 3,000 homes and businesses in parts of Wales using vouchers. In addition, a further 2,300 vouchers had been issued for connection within the next 12 months.<\/p>\n<p>\u27a4 <strong>Northern Ireland<br \/>\n<\/strong><\/p>\n<p>Project Gigabit related procurements are still expected to begin in the autumn.<\/p>\n<p>As of the end of May 2023, 8,300 homes and businesses in parts of Northern Ireland had been connected using vouchers. In addition, a further 1,300 vouchers had been issued for connection within the next 12 months.<\/p>\n<p>\u27a4 <strong>Scotland<br \/>\n<\/strong><\/p>\n<p>The <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/scotgov\" target=\"_blank\">Scottish Government<\/a> has committed to launch Project Gigabit procurements in the autumn.<\/p>\n<p>Gigabit vouchers continue to be actively delivered in Scotland. There have now been 3,400 Project Gigabit voucher funded connections of which 400 benefited from the <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/scotgov\" target=\"_blank\">Scottish Government<\/a> top-up. A further 800 vouchers have been issued for connection in the next 12 months.<\/p><\/blockquote>\n<p>Otherwise, you can see a summary of the wider contract progress below.<\/p>\n<p style=\"text-align: center;\"><span style=\"color: #339966;\"><strong>Live GIS Contracts (Signed)<\/strong><\/span><\/p>\n<table width=\"100%\" cellspacing=\"2\" cellpadding=\"2\" border=\"0\">\n<thead>\n<tr>\n<th class=\"bq3\">Area<\/th>\n<th class=\"bq3\">Contract Awarded<\/th>\n<th class=\"bq3\">Uncommercial Premises<\/th>\n<th class=\"bq3\">Value<\/th>\n<\/tr>\n<tr>\n<td width=\"157\">North Dorset (Lot 14.01)<\/td>\n<td width=\"144\">25-Aug-22<\/td>\n<td width=\"67\">7,000<\/td>\n<td width=\"152\">\u00a36.3 million<\/td>\n<\/tr>\n<tr>\n<td>Teesdale (Lot 4.01)<\/td>\n<td>22-Sep-22<\/td>\n<td>4,000<\/td>\n<td>\u00a36.7 million<\/td>\n<\/tr>\n<tr>\n<td>North Northumberland (Lot 34.01)<\/td>\n<td>14-Oct-22<\/td>\n<td>3,700<\/td>\n<td>\u00a37.4 million<\/td>\n<\/tr>\n<tr>\n<td>Cumbria (Lot 28)<\/td>\n<td>29-Nov-22<\/td>\n<td>59,000<\/td>\n<td>\u00a3108.5 million<\/td>\n<\/tr>\n<tr>\n<td>Central Cornwall (Lot 32.02)<\/td>\n<td>19-Jan-23<\/td>\n<td>9,200<\/td>\n<td>\u00a318 million<\/td>\n<\/tr>\n<tr>\n<td>South West Cornwall (Lot 32.03)<\/td>\n<td>19-Jan-23<\/td>\n<td>9,500<\/td>\n<td>\u00a318 million<\/td>\n<\/tr>\n<tr>\n<td>Cambridgeshire and adjacent areas (Lot 5)<\/td>\n<td>23-Mar-23<\/td>\n<td>44,400<\/td>\n<td>\u00a369 million<\/td>\n<\/tr>\n<tr>\n<td>New Forest (Lot 27.01)<\/td>\n<td>27-Mar-23<\/td>\n<td>10,400<\/td>\n<td>\u00a313.8 million<\/td>\n<\/tr>\n<tr>\n<td>North Shropshire (Lot 25.02)<\/td>\n<td>19-Apr-24<\/td>\n<td>12,000<\/td>\n<td>\u00a324 million<\/td>\n<\/tr>\n<tr>\n<td>Norfolk (Lot 7)<\/td>\n<td>28-Jun-23<\/td>\n<td>62,200<\/td>\n<td>\u00a3114.2 million<\/td>\n<\/tr>\n<tr>\n<td>Suffolk (Lot 2)<\/td>\n<td>28-Jun-23<\/td>\n<td>79,500<\/td>\n<td>\u00a3100.5 million<\/td>\n<\/tr>\n<tr>\n<td>Hampshire (Lot 27)<\/td>\n<td>28-Jun-23<\/td>\n<td>75,500<\/td>\n<td>\u00a3104.2 million<\/td>\n<\/tr>\n<\/thead>\n<\/table>\n<p>Take note that, once a contract has been signed, it sometimes takes operators several months of engineering surveys before they can begin to start the build. Likewise, the detailed rollout plan for these first contracts won\u2019t be known until those surveys have been completed. Furthermore, the contract values above are only referencing public investment, but it&#8217;s hoped that suppliers may also contribute some of their own private funding.<\/p>\n<p>On top of the already agreed contracts, Project Gigabit also has a growing number of local and regional deals in the procurement phase for other parts of the UK (see below) and will be awarding contracts for these over the coming months and years. The dates and figures mentioned below are tentative estimates (subject to change) and will remain that way until after the contracts have been awarded.<\/p>\n<p>Bidders on the related LOTS will be required to ensure that their networks and infrastructure are available for use by other ISPs via wholesale (open access). Various operators, both big and small (e.g. <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/openreach\" target=\"_blank\">Openreach<\/a>, <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/cityfibre\" target=\"_blank\">Cityfibre<\/a>, <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/fibrus\" rel=\"nofollow\" target=\"_blank\">Fibrus<\/a>, <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/gigaclear\" rel=\"nofollow\" target=\"_blank\">Gigaclear<\/a>, <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/vm\" rel=\"nofollow\" target=\"_blank\">Virgin Media<\/a> [VMO2] etc.), are expected to take part and areas with sub-30Mbps speeds are being prioritised, albeit NOT to the exclusion of all else.<\/p>\n<p>Alongside all this, the government and local bodies are also conducting various <strong>Public Reviews<\/strong> and <strong>Open Market Reviews<\/strong> (OMR), which is the process they use when trying to identify existing commercial coverage of gigabit-capable networks and any planned coverage over the next c.3 years. By doing that, they can more easily target their support toward areas where commercial projects will not go (i.e. the intervention area).<\/p>\n<p style=\"text-align: center;\"><span style=\"color: #339966;\"><strong>Live GIS Procurements<\/strong><\/span><\/p>\n<table width=\"100%\" cellspacing=\"2\" cellpadding=\"2\" border=\"0\">\n<thead>\n<tr>\n<th class=\"bq3\">Area<\/th>\n<th class=\"bq3\">Est. Contract Award Date<\/th>\n<th class=\"bq3\">Uncommercial Premises<\/th>\n<th class=\"bq3\">Value<\/th>\n<\/tr>\n<tr>\n<td width=\"157\">North East England (Lot 4)<\/td>\n<td width=\"144\">May-23<\/td>\n<td width=\"67\">51,850<\/td>\n<td width=\"152\">\u00a382.7 million<\/td>\n<\/tr>\n<tr>\n<td>Worcestershire (Lot 24)<\/td>\n<td>July to September 2023<\/td>\n<td>18,400<\/td>\n<td>\u00a339.4 million<\/td>\n<\/tr>\n<tr>\n<td>Buckinghamshire, (part of) Hertfordshire and East of Berkshire (Lot 26)<\/td>\n<td>July to September 2023<\/td>\n<td>40,300<\/td>\n<td>\u00a358.8 million<\/td>\n<\/tr>\n<tr>\n<td>Kent (Lot 29)<\/td>\n<td>July to September 2023<\/td>\n<td>72,000<\/td>\n<td>\u00a3112.3 million<\/td>\n<\/tr>\n<tr>\n<td>West and East Sussex (Lots 16 and 1)<\/td>\n<td>July to September 2023<\/td>\n<td>62,100<\/td>\n<td>\u00a3100.6 million<\/td>\n<\/tr>\n<tr>\n<td>South Wiltshire (Lot 30)<\/td>\n<td>October to December 2023<\/td>\n<td>19,000<\/td>\n<td>\u00a324.8 million<\/td>\n<\/tr>\n<tr>\n<td>Bedfordshire, Northamptonshire and Milton Keynes (Lot 12)<\/td>\n<td>October to December 2023<\/td>\n<td>30,300<\/td>\n<td>\u00a351.4 million<\/td>\n<\/tr>\n<tr>\n<td>Derbyshire (Lot 3)<\/td>\n<td>October to December 2023<\/td>\n<td>18,200<\/td>\n<td>\u00a333.4 million<\/td>\n<\/tr>\n<tr>\n<td>Leicestershire and Warwickshire (Lot 11)<\/td>\n<td>November 2023 to January 2024<\/td>\n<td>45,400<\/td>\n<td>\u00a371.5 million<\/td>\n<\/tr>\n<tr>\n<td>Nottinghamshire and West of Lincolnshire (Lot 10)<\/td>\n<td>November 2023 to January 2024<\/td>\n<td>35,700<\/td>\n<td>\u00a358.6 million<\/td>\n<\/tr>\n<tr>\n<td>South Oxfordshire (Lot 13.01)<\/td>\n<td>August to September 2023<\/td>\n<td>6,500<\/td>\n<td>\u00a317 million<\/td>\n<\/tr>\n<tr>\n<td>North Oxfordshire (Lot 13.02)<\/td>\n<td>August to September 2023<\/td>\n<td>4,900<\/td>\n<td>\u00a311.2 million<\/td>\n<\/tr>\n<tr>\n<td>North East Staffordshire (Lot 19.01)<\/td>\n<td>September to November 2023<\/td>\n<td>6,200<\/td>\n<td>\u00a316.6 million<\/td>\n<\/tr>\n<tr>\n<td>West Yorkshire and York Area (Lot 8)<\/td>\n<td>November 2023 to January 2024<\/td>\n<td>29,000<\/td>\n<td>\u00a360.9 million<\/td>\n<\/tr>\n<tr>\n<td>South Yorkshire (Lot 20)<\/td>\n<td>November 2023 to January 2024<\/td>\n<td>32,400<\/td>\n<td>\u00a344.4 million<\/td>\n<\/tr>\n<tr>\n<td>Mid West Shropshire (Lot 25.01)<\/td>\n<td>November 2023 to January 2024<\/td>\n<td>6,000<\/td>\n<td>\u00a312 million<\/td>\n<\/tr>\n<tr>\n<td>Dorset and South Somerset (Lot 14)<\/td>\n<td>January to March 2024<\/td>\n<td>22,600<\/td>\n<td>\u00a343.2 million<\/td>\n<\/tr>\n<tr>\n<td>Cornwall and Isles of Scilly (Lot 32 )<\/td>\n<td>April to June 2024<\/td>\n<td>18,600<\/td>\n<td>\u00a341.2 million<\/td>\n<\/tr>\n<\/thead>\n<\/table>\n<p>Finally, BDUK has a long list of future procurements in their pipeline (see below), which represents an indicative forward view of commercial activity to be undertaken by the programme. Some of the information provided is based on modelled data that will be superseded, while estimated contract award dates should all be taken with a pinch of salt as the targets do sometimes slip by several months (not unusual for such a complex scheme).<\/p>\n<p style=\"text-align: center;\"><span style=\"color: #339966;\"><strong>Future GIS Procurements<\/strong><\/span><\/p>\n<table width=\"100%\" cellspacing=\"2\" cellpadding=\"2\" border=\"0\">\n<thead>\n<tr>\n<th class=\"bq3\">Area<\/th>\n<th class=\"bq3\">Est. Contract Award Date<\/th>\n<th class=\"bq3\">Uncommercial Premises<\/th>\n<th class=\"bq3\">Value<\/th>\n<\/tr>\n<tr>\n<td width=\"157\">Cheshire (Lot 17)<\/td>\n<td width=\"144\">January to March 2024<\/td>\n<td width=\"67\">17,700<\/td>\n<td width=\"152\">\u00a344.8 million<\/td>\n<\/tr>\n<tr>\n<td>Herefordshire (Lot 15)<\/td>\n<td>January to March 2024<\/td>\n<td>7,900<\/td>\n<td>\u00a321.5 million<\/td>\n<\/tr>\n<tr>\n<td>Gloucestershire (Lot 18)<\/td>\n<td>January to March 2024<\/td>\n<td>4,900<\/td>\n<td>\u00a315.6 million<\/td>\n<\/tr>\n<tr>\n<td>Lincolnshire (including NE Lincolnshire and N Lincolnshire) and East Riding (Lot 23)<\/td>\n<td>January to March 2024<\/td>\n<td>74,200<\/td>\n<td>\u00a3119.3 million<\/td>\n<\/tr>\n<tr>\n<td>North Yorkshire (Lot 31)<\/td>\n<td>April to June 2024<\/td>\n<td>41,900<\/td>\n<td>\u00a363 to \u00a3127 million<\/td>\n<\/tr>\n<tr>\n<td>Lancashire, North Wiltshire and South Gloucestershire, West and Mid-Surrey, Staffordshire, West Berkshire Hertfordshire<\/td>\n<td rowspan=\"2\">April 2024 to June 2024<\/td>\n<td rowspan=\"2\">57,500<\/td>\n<td rowspan=\"2\">\u00a3149.7 million<\/td>\n<\/tr>\n<tr>\n<td>(Call-Off 1)<\/td>\n<\/tr>\n<tr>\n<td>West and North Devon, North West and Mid Wales, South East Wales<\/td>\n<td rowspan=\"2\">April 2024 to June 2024<\/td>\n<td rowspan=\"2\">47,700<\/td>\n<td rowspan=\"2\">\u00a3139.7 million<\/td>\n<\/tr>\n<tr>\n<td>(Call-Off 2)<\/td>\n<\/tr>\n<tr>\n<td>Devon and North Somerset (Lot 6)<\/td>\n<td>TBC<\/td>\n<td>TBC<\/td>\n<td>TBC*<\/td>\n<\/tr>\n<\/thead>\n<\/table>\n<div class=\"bq2\"><strong>NOTE:<\/strong> * BDUK are currently undertaking the design process for the Devon and North Somerset intervention. With a number of options remaining on the table, they have included it in the pipeline as TBC, but will be firming up their proposed intervention in due course.<\/div>\n<p>Sadly, it&#8217;s still taking far too long to get all of these contracts into procurement, let alone award them. The new and more automated DPS system was supposed to make all of this faster and more efficient than just handing the funding to local authorities, but it&#8217;s difficult to see the benefits when so many areas seem to be lagging behind and some won&#8217;t even see contracts awarded until mid-2024 or later.<\/p>\n<p>On top of that, we&#8217;re still waiting for BDUK to launch a centralised website for clearly communicating their progress on each contract, which is something that we&#8217;ve previously been told was on the cards. The quarterly updates they issue are useful, but they&#8217;re too tedious for regular people to find and follow, unless you&#8217;re already familiar with the programme. A clean, clear and simple public website would help this.<\/p>\n<p>However, we should remind readers that this rollout is NOT an automatic upgrade, thus you will still need to order the service from a supporting ISP in order to benefit. Similarly, 1Gbps is the target speed, but slower and cheaper options will also exist on the same lines.<\/p>\n<p>The focus on &#8220;<em>gigabit<\/em>&#8221; speeds also overlooks the fact that this largely relates to download performance, while BDUK&#8217;s technical definition for the project appears to suggest that a minimum speed of 200Mbps would be acceptable when only looking at the upstream side (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2021\/08\/the-uk-govs-technical-definition-of-gigabit-capable-broadband.html\">here<\/a>). This is understandable, as not all gigabit networks today are actually setup to deliver true symmetric speeds, even though some may advertise them.<\/p>\n<p>Lest we forget that there are a lot of real-world reasons why consumers buying a 1Gbps package might not actually be able to achieve the top speed, due to certain realities (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2020\/12\/why-buying-gigabit-broadband-doesnt-always-deliver-1gbps.html\"><strong>Why Buying Gigabit Broadband Doesn&#8217;t Always Deliver 1Gbps<\/strong><\/a>).<\/p>\n<p>Finally, we should add that the Government has previously warned that those in the final 1% may still be \u201c<em>prohibitively expensive to reach<\/em>\u201c, although they\u2019ve recently clarified that less than 0.3% of the country (i.e. under 100,000 premises) are likely to fall into this category (roughly the same gap that the 10Mbps USO has struggled to fill). Solutions for those in the final 0.3% of \u201c<em>Very Hard to Reach<\/em>\u201d areas are still being tested.<\/p>\n<blockquote><p><span style=\"color: #339966;\"><strong>Project Gigabit Summer (June 2023) Update<\/strong><\/span><br \/>\n<a href=\"https:\/\/www.gov.uk\/government\/publications\/project-gigabit-progress-update-june-2023\/project-gigabit-progress-update-june-2023\" target=\"_blank\" rel=\"noopener\">https:\/\/www.gov.uk\/..\/project-gigabit-delivery-plan-june-update-2023<\/a><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government&#8217;s \u00a35bn rural Project Gigabit broadband rollout progress, which has so far awarded rollout contracts worth a total of \u00a3589m (state aid) to help extend coverage to an extra 378,450 of the hardest to reach premises.<\/p>\n","protected":false},"author":1,"featured_media":34904,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1,1645],"tags":[471,56,414,38,1997,89,537,71],"class_list":["post-33818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uk_isp_news","category-key_uk_isp_industry_developments","tag-bduk","tag-fttp","tag-northern-ireland","tag-politics","tag-uk-gigabit-programme","tag-scotland","tag-uso","tag-wales"],"share_on_mastodon":{"url":"","error":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Summer 2023 BDUK Update on UK Project Gigabit Broadband Build - ISPreview UK<\/title>\n<meta name=\"description\" content=\"The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government&#039;s \u00a35bn rural Project Gigabit broadband rollout\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build - ISPreview UK\" \/>\n<meta property=\"og:description\" content=\"The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government&#039;s \u00a35bn rural Project Gigabit broadband rollout\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\" \/>\n<meta property=\"og:site_name\" content=\"ISPreview UK\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ispreview\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/ispreview\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-02T23:01:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-03T14:08:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/07\/nggallery_import\/Project-Gigabit-June-2023-UK-Progress-Map.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mark Jackson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ispreview\" \/>\n<meta name=\"twitter:site\" content=\"@ispreview\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Jackson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\"},\"author\":{\"name\":\"Mark Jackson\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/person\\\/de66a8b4e937c21c80e443d1bf9c35d5\"},\"headline\":\"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build\",\"datePublished\":\"2023-07-02T23:01:40+00:00\",\"dateModified\":\"2023-07-03T14:08:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\"},\"wordCount\":2059,\"commentCount\":18,\"publisher\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/nggallery_import\\\/Project-Gigabit-June-2023-UK-Progress-Map.jpg\",\"keywords\":[\"Building Digital UK\",\"FTTP\",\"Northern Ireland\",\"Politics\",\"Project Gigabit\",\"Scotland\",\"USO\",\"Wales\"],\"articleSection\":[\"ISP News\",\"Key Developments\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\",\"name\":\"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build - ISPreview UK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/nggallery_import\\\/Project-Gigabit-June-2023-UK-Progress-Map.jpg\",\"datePublished\":\"2023-07-02T23:01:40+00:00\",\"dateModified\":\"2023-07-03T14:08:29+00:00\",\"description\":\"The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government's \u00a35bn rural Project Gigabit broadband rollout\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/nggallery_import\\\/Project-Gigabit-June-2023-UK-Progress-Map.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/nggallery_import\\\/Project-Gigabit-June-2023-UK-Progress-Map.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"Project-Gigabit-June-2023-UK-Progress-Map\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2023\\\/07\\\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#website\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\",\"name\":\"ISPreview UK\",\"description\":\"Top Broadband ISP and Mobile Provider Information Site\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ispreview.co.uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\",\"name\":\"ISPreview.co.uk\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ispreview_uk_logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ispreview_uk_logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"ISPreview.co.uk\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ispreview\",\"https:\\\/\\\/x.com\\\/ispreview\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/mjack\\\/\",\"https:\\\/\\\/bsky.app\\\/profile\\\/ispreview.bsky.social\",\"https:\\\/\\\/mastodon.social\\\/@ispreview\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/person\\\/de66a8b4e937c21c80e443d1bf9c35d5\",\"name\":\"Mark Jackson\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"caption\":\"Mark Jackson\"},\"description\":\"By Mark Jackson Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and Linkedin.\",\"sameAs\":[\"http:\\\/\\\/www.ispreview.co.uk\",\"https:\\\/\\\/www.facebook.com\\\/ispreview\",\"https:\\\/\\\/x.com\\\/ispreview\"],\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/author\\\/markj\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build - ISPreview UK","description":"The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government's \u00a35bn rural Project Gigabit broadband rollout","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html","og_locale":"en_GB","og_type":"article","og_title":"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build - ISPreview UK","og_description":"The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government's \u00a35bn rural Project Gigabit broadband rollout","og_url":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html","og_site_name":"ISPreview UK","article_publisher":"https:\/\/www.facebook.com\/ispreview","article_author":"https:\/\/www.facebook.com\/ispreview","article_published_time":"2023-07-02T23:01:40+00:00","article_modified_time":"2023-07-03T14:08:29+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/07\/nggallery_import\/Project-Gigabit-June-2023-UK-Progress-Map.jpg","type":"image\/jpeg"}],"author":"Mark Jackson","twitter_card":"summary_large_image","twitter_creator":"@ispreview","twitter_site":"@ispreview","twitter_misc":{"Written by":"Mark Jackson","Estimated reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#article","isPartOf":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html"},"author":{"name":"Mark Jackson","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/person\/de66a8b4e937c21c80e443d1bf9c35d5"},"headline":"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build","datePublished":"2023-07-02T23:01:40+00:00","dateModified":"2023-07-03T14:08:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html"},"wordCount":2059,"commentCount":18,"publisher":{"@id":"https:\/\/www.ispreview.co.uk\/#organization"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage"},"thumbnailUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/07\/nggallery_import\/Project-Gigabit-June-2023-UK-Progress-Map.jpg","keywords":["Building Digital UK","FTTP","Northern Ireland","Politics","Project Gigabit","Scotland","USO","Wales"],"articleSection":["ISP News","Key Developments"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html","url":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html","name":"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build - ISPreview UK","isPartOf":{"@id":"https:\/\/www.ispreview.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage"},"thumbnailUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/07\/nggallery_import\/Project-Gigabit-June-2023-UK-Progress-Map.jpg","datePublished":"2023-07-02T23:01:40+00:00","dateModified":"2023-07-03T14:08:29+00:00","description":"The Building Digital UK agency has published their latest quarterly update (June 2023) on the Government's \u00a35bn rural Project Gigabit broadband rollout","breadcrumb":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#primaryimage","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/07\/nggallery_import\/Project-Gigabit-June-2023-UK-Progress-Map.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/07\/nggallery_import\/Project-Gigabit-June-2023-UK-Progress-Map.jpg","width":1000,"height":1000,"caption":"Project-Gigabit-June-2023-UK-Progress-Map"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2023\/07\/summer-2023-bduk-update-on-uk-project-gigabit-broadband-build.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ispreview.co.uk\/"},{"@type":"ListItem","position":2,"name":"Summer 2023 BDUK Update on UK Project Gigabit Broadband Build"}]},{"@type":"WebSite","@id":"https:\/\/www.ispreview.co.uk\/#website","url":"https:\/\/www.ispreview.co.uk\/","name":"ISPreview UK","description":"Top Broadband ISP and Mobile Provider Information Site","publisher":{"@id":"https:\/\/www.ispreview.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ispreview.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.ispreview.co.uk\/#organization","name":"ISPreview.co.uk","url":"https:\/\/www.ispreview.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2020\/07\/ispreview_uk_logo.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2020\/07\/ispreview_uk_logo.jpg","width":1000,"height":1000,"caption":"ISPreview.co.uk"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ispreview","https:\/\/x.com\/ispreview","https:\/\/www.linkedin.com\/in\/mjack\/","https:\/\/bsky.app\/profile\/ispreview.bsky.social","https:\/\/mastodon.social\/@ispreview"]},{"@type":"Person","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/person\/de66a8b4e937c21c80e443d1bf9c35d5","name":"Mark Jackson","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","caption":"Mark Jackson"},"description":"By Mark Jackson Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and Linkedin.","sameAs":["http:\/\/www.ispreview.co.uk","https:\/\/www.facebook.com\/ispreview","https:\/\/x.com\/ispreview"],"url":"https:\/\/www.ispreview.co.uk\/index.php\/author\/markj"}]}},"_links":{"self":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/33818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=33818"}],"version-history":[{"count":0,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/33818\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/media\/34904"}],"wp:attachment":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=33818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/categories?post=33818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/tags?post=33818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}