{"id":47883,"date":"2026-09-02T07:42:38","date_gmt":"2026-09-02T06:42:38","guid":{"rendered":"https:\/\/www.ispreview.co.uk\/?p=47883"},"modified":"2026-09-02T07:43:50","modified_gmt":"2026-09-02T06:43:50","slug":"feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins","status":"publish","type":"post","link":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html","title":{"rendered":"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins"},"content":{"rendered":"<p>The <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/scotgov\" target=\"_blank\">Scottish Government<\/a> yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to &#8220;<em>identify and evaluate potential options<\/em>&#8221; for deploying a new subsea fibre optic cable between mainland Scotland and the Shetland Islands. The goal being to improve broadband and mobile redundancy, as well as performance.<!--more--><\/p>\n<p>Shetland is already connected by two major subsea fibre cables, including the <a href=\"http:\/\/www.shefa.fo\" target=\"_blank\" rel=\"noopener\">SHEFA-2<\/a> (Faroese Telecom) submarine (subsea) and the <strong>R100 North<\/strong> cable that was recently built by broadband giant <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/britishtelecom\" rel=\"nofollow\" target=\"_blank\">BT<\/a> as part of the <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/scotgov\" target=\"_blank\">Scottish Government<\/a>\u2019s \u00a3600m Reaching 100% (<strong>R100<\/strong>) project (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2022\/05\/openreach-to-start-r100-subsea-fibre-broadband-build-in-scotland.html\">here<\/a>). The R100 project also built a number of smaller subsea fibre links between mainland Shetland and its smaller islands.<\/p>\n<div class=\"bq2\"><strong>NOTE:<\/strong> Shetland is a remote subarctic archipelago that resides roughly 110 miles north of Scotland. The islands are home to a population of over 23,000.<\/div>\n<p>Despite this, Shetland occasionally suffers from subsea cable breaks (two occurred in 2025 alone), which cause plenty of disruption to parts of the island\u2019s broadband and mobile services when they occur (often lasting several weeks). The nature of the local network arrangements also means that some operators don&#8217;t currently harness all of the available subsea links, which can make the impact of such outages quite variable.<\/p>\n<p>In response the <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2026\/04\/snp-2026-manifesto-dangles-possible-subsea-fibre-cable-to-shetland-islands.html\">SNP&#8217;s previous 2026 manifesto<\/a> pledged to undertake a feasibility study on the deployment of an additional subsea link to Shetland, although it should be noted that this is NOT the same as making a solid commitment to actually build the new cable. The good news is that this study has now officially begun.<\/p>\n<p>The new <a href=\"https:\/\/www.gov.scot\/binaries\/content\/documents\/govscot\/publications\/strategy-plan\/2026\/09\/programme-government-2026-2031\/documents\/programme-government-2026-2031\/programme-government-2026-2031\/govscot%3Adocument\/programme-government-2026-2031.pdf\" target=\"_blank\" rel=\"noopener\">Programme for Government<\/a> document simply states that one of its very first actions is to &#8220;<em>initiate a feasibility study to identify and evaluate potential options for a new subsea cable between Shetland and mainland Scotland, with the aim of increasing network resilience and reducing vulnerability to service disruption<\/em>.&#8221; Greater redundancy could potentially also help to attract data centres to the isles.<\/p>\n<p>The feasibility study reflects the <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/scotgov\" target=\"_blank\">Scottish Government<\/a>&#8217;s activity within their first year of their new programme (2026-27), but as above it remains to be seen whether or not this will result in an actual deployment. Running new subsea fibre links is an expensive business (potentially costing around \u00a330m to \u00a360m &#8211; educated guess) and that&#8217;s to serve a relatively small population.<\/p>\n<p>Lest we forget that telecoms giant VodafoneThree UK are already conducting a \u201c<em>feasibility study<\/em>\u201d of their own to explore the possibility and cost of deploying a new subsea fibre optic cable system to help transform broadband and mobile connectivity on the Shetland Islands (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/2025\/06\/new-subsea-cable-link-being-explored-for-the-shetland-islands.html\">here<\/a>). But the outcome of that is just as uncertain and likely to be impacted by the Scottish Government&#8217;s own process.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to &#8220;identify and evaluate potential options&#8221; for deploying a new subsea fibre optic cable between mainland Scotland and the Shetland Islands. The goal being to improve broadband and mobile redundancy, as well as [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47885,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[474,52,38,89,101],"class_list":["post-47883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uk_isp_news","tag-bt","tag-fibre-optic","tag-politics","tag-scotland","tag-shetland-islands"],"share_on_mastodon":{"url":"https:\/\/mastodon.social\/@ispreview\/117200091128419050","error":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins - ISPreview UK<\/title>\n<meta name=\"description\" content=\"The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to &quot;identify and\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins - ISPreview UK\" \/>\n<meta property=\"og:description\" content=\"The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to &quot;identify and\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\" \/>\n<meta property=\"og:site_name\" content=\"ISPreview UK\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ispreview\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/ispreview\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-02T06:42:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-02T06:43:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2026\/09\/nggallery_import\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1755\" \/>\n\t<meta property=\"og:image:height\" content=\"1755\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Mark Jackson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ispreview\" \/>\n<meta name=\"twitter:site\" content=\"@ispreview\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Jackson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\"},\"author\":{\"name\":\"Mark Jackson\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/person\\\/de66a8b4e937c21c80e443d1bf9c35d5\"},\"headline\":\"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins\",\"datePublished\":\"2026-09-02T06:42:38+00:00\",\"dateModified\":\"2026-09-02T06:43:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\"},\"wordCount\":465,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/nggallery_import\\\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp\",\"keywords\":[\"BT\",\"Fibre Optic\",\"Politics\",\"Scotland\",\"shetland islands\"],\"articleSection\":[\"ISP News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\",\"name\":\"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins - ISPreview UK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/nggallery_import\\\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp\",\"datePublished\":\"2026-09-02T06:42:38+00:00\",\"dateModified\":\"2026-09-02T06:43:50+00:00\",\"description\":\"The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to \\\"identify and\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/nggallery_import\\\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/nggallery_import\\\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp\",\"width\":1755,\"height\":1755,\"caption\":\"Shetland Islands and Scotland Google Maps Screenshot\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2026\\\/09\\\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#website\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\",\"name\":\"ISPreview UK\",\"description\":\"Top Broadband ISP and Mobile Provider Information Site\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ispreview.co.uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\",\"name\":\"ISPreview.co.uk\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ispreview_uk_logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ispreview_uk_logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"ISPreview.co.uk\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ispreview\",\"https:\\\/\\\/x.com\\\/ispreview\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/mjack\\\/\",\"https:\\\/\\\/bsky.app\\\/profile\\\/ispreview.bsky.social\",\"https:\\\/\\\/mastodon.social\\\/@ispreview\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/person\\\/de66a8b4e937c21c80e443d1bf9c35d5\",\"name\":\"Mark Jackson\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"caption\":\"Mark Jackson\"},\"description\":\"By Mark Jackson Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and Linkedin.\",\"sameAs\":[\"http:\\\/\\\/www.ispreview.co.uk\",\"https:\\\/\\\/www.facebook.com\\\/ispreview\",\"https:\\\/\\\/x.com\\\/ispreview\"],\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/author\\\/markj\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins - ISPreview UK","description":"The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to \"identify and","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html","og_locale":"en_GB","og_type":"article","og_title":"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins - ISPreview UK","og_description":"The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to \"identify and","og_url":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html","og_site_name":"ISPreview UK","article_publisher":"https:\/\/www.facebook.com\/ispreview","article_author":"https:\/\/www.facebook.com\/ispreview","article_published_time":"2026-09-02T06:42:38+00:00","article_modified_time":"2026-09-02T06:43:50+00:00","og_image":[{"width":1755,"height":1755,"url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2026\/09\/nggallery_import\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp","type":"image\/webp"}],"author":"Mark Jackson","twitter_card":"summary_large_image","twitter_creator":"@ispreview","twitter_site":"@ispreview","twitter_misc":{"Written by":"Mark Jackson","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#article","isPartOf":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html"},"author":{"name":"Mark Jackson","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/person\/de66a8b4e937c21c80e443d1bf9c35d5"},"headline":"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins","datePublished":"2026-09-02T06:42:38+00:00","dateModified":"2026-09-02T06:43:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html"},"wordCount":465,"commentCount":0,"publisher":{"@id":"https:\/\/www.ispreview.co.uk\/#organization"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage"},"thumbnailUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2026\/09\/nggallery_import\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp","keywords":["BT","Fibre Optic","Politics","Scotland","shetland islands"],"articleSection":["ISP News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html","url":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html","name":"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins - ISPreview UK","isPartOf":{"@id":"https:\/\/www.ispreview.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage"},"thumbnailUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2026\/09\/nggallery_import\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp","datePublished":"2026-09-02T06:42:38+00:00","dateModified":"2026-09-02T06:43:50+00:00","description":"The Scottish Government yesterday set out their work plan for the next five years, which among other things initiated a feasibility study to \"identify and","breadcrumb":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#primaryimage","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2026\/09\/nggallery_import\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2026\/09\/nggallery_import\/Shetland-Islands-and-Scotland-Google-Maps-Screenshot.webp","width":1755,"height":1755,"caption":"Shetland Islands and Scotland Google Maps Screenshot"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2026\/09\/feasibility-study-on-new-subsea-fibre-cable-for-shetland-islands-begins.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ispreview.co.uk\/"},{"@type":"ListItem","position":2,"name":"Feasibility Study on New Subsea Fibre Cable for Shetland Islands Begins"}]},{"@type":"WebSite","@id":"https:\/\/www.ispreview.co.uk\/#website","url":"https:\/\/www.ispreview.co.uk\/","name":"ISPreview UK","description":"Top Broadband ISP and Mobile Provider Information Site","publisher":{"@id":"https:\/\/www.ispreview.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ispreview.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.ispreview.co.uk\/#organization","name":"ISPreview.co.uk","url":"https:\/\/www.ispreview.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2020\/07\/ispreview_uk_logo.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2020\/07\/ispreview_uk_logo.jpg","width":1000,"height":1000,"caption":"ISPreview.co.uk"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ispreview","https:\/\/x.com\/ispreview","https:\/\/www.linkedin.com\/in\/mjack\/","https:\/\/bsky.app\/profile\/ispreview.bsky.social","https:\/\/mastodon.social\/@ispreview"]},{"@type":"Person","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/person\/de66a8b4e937c21c80e443d1bf9c35d5","name":"Mark Jackson","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","caption":"Mark Jackson"},"description":"By Mark Jackson Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and Linkedin.","sameAs":["http:\/\/www.ispreview.co.uk","https:\/\/www.facebook.com\/ispreview","https:\/\/x.com\/ispreview"],"url":"https:\/\/www.ispreview.co.uk\/index.php\/author\/markj"}]}},"_links":{"self":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/47883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=47883"}],"version-history":[{"count":0,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/47883\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/media\/47885"}],"wp:attachment":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=47883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/categories?post=47883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/tags?post=47883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}