{"id":6640,"date":"2014-05-06T02:08:41","date_gmt":"2014-05-06T01:08:41","guid":{"rendered":"http:\/\/www.ispreview.co.uk\/?p=6640"},"modified":"2014-05-06T07:24:07","modified_gmt":"2014-05-06T06:24:07","slug":"bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds","status":"publish","type":"post","link":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html","title":{"rendered":"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds"},"content":{"rendered":"<p>BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (<em>ITU-T G.993.5<\/em>) technology into a second phase, which could improve the speeds delivered via <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/britishtelecom\" rel=\"nofollow\" target=\"_blank\">BT<\/a>&#8217;s existing &#8220;<em>up to<\/em>&#8221; 80Mbps hybrid-fibre (<a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/fttc\">FTTC<\/a>) superfast broadband network by helping to eliminate interference (crosstalk). But it might also push any future roll-out back to late 2014 or 2015.<\/p>\n<p><!--more--><\/p>\n<p>Regular readers will recall that <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/openreach\" target=\"_blank\">Openreach<\/a> began their <a href=\"http:\/\/www.ispreview.co.uk\/index.php\/2013\/09\/vectoring-trials-begin-as-bt-looks-to-improve-uk-fttc-broadband-isp-speeds.html\" target=\"_blank\">first field trials<\/a> of Vectoring technology in September last year, which works a bit like those noise cancelling headphones and employs the coordination of multiple copper line signals in order to create a reduction of interference (i.e. in order to work at its best all of a street cabinets <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/fttc\">FTTC<\/a> lines must be upgraded but there is some flexibility).<\/p>\n<p>The first trial began with three street cabinets [26, 41 and 42] in <strong>Barnet<\/strong> (London) and another three [12, 39 and 74] in <strong>Braintree<\/strong> (Essex). At the time <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/openreach\" target=\"_blank\">Openreach<\/a> said that its trials would be &#8220;<em>monitoring the maximum speed trial lines could theoretically achieve<\/em>&#8221; and indeed similar deployments by <a href=\"http:\/\/pressroom.eircom.net\/press_releases\/article\/eircoms_Fibre_Network_to_Offer_Broadband_Speeds_of_100Mb\/\" target=\"_blank\">Eircom<\/a> in Ireland have seen headline rates jump from &#8220;<em>up to<\/em>&#8221; 70Mbps to <strong>100Mbps<\/strong>. Danish Vectoring trials, which are arguably more comparable to the UK&#8217;s infrastructure, have also recorded a similar capability jump to 100Mbps.<\/p>\n<p>However <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/britishtelecom\" rel=\"nofollow\" target=\"_blank\">BT<\/a>&#8217;s Head of Access Platform Innovation, <strong>Kevin Foster<\/strong>, last year cautioned that Vectoring was being seen more as a &#8220;<em>speed enabler rather than a speed booster<\/em>&#8221; and the operator currently has no immediate plans to increase the advertised rate from its current maximum of 80Mbps (but we wouldn&#8217;t be at all surprised if they did.. eventually).<\/p>\n<p>At the same time ISPreview.co.uk also revealed last year that <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/openreach\" target=\"_blank\">Openreach<\/a> had been conducting a separate &#8220;<em>limited trial<\/em>&#8221; of <strong>Physical Retransmission<\/strong> (<em>G.INP<\/em>) on a small number of <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/fttc\">FTTC<\/a>\/VDSL lines (<a href=\"http:\/\/www.ispreview.co.uk\/index.php\/2013\/10\/sky-broadband-upgrade-unbundled-uk-network-boost-performance.html\" target=\"_blank\">here<\/a>), which is a method designed to tackle spikes \/ burst of electromagnetic interference (impulse noise); this can make some problematic lines more stable and less prone to errors (we&#8217;ll touch on this again later). <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/bskyb\" rel=\"nofollow\" target=\"_blank\">Sky Broadband<\/a> also use G.INP.<\/p>\n<p>But since last year we&#8217;ve heard very little about the progress of Openreach&#8217;s trial, which is not for lack of trying. The good news is that the sheet of thick ice that appears to have been covering the flow of Vectoring related information from <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/britishtelecom\" rel=\"nofollow\" target=\"_blank\">BT<\/a> appears to be thawing, which began in February 2014 after we heard that BT had begun evaluating the results from the first trial.<\/p>\n<h3><span style=\"color: #339966;\"><strong>Trial Phase One.. Results?<\/strong><\/span><\/h3>\n<p>The first good news surfaced in March 2014 when a communication to ISPs revealed that BT had seen what appears to be, as <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/plusnetuk\" rel=\"nofollow\" target=\"_blank\">PlusNet<\/a> put it, a &#8220;<em>very positive<\/em>&#8221; outcome to the Vectoring trials. Similarly ISPreview.co.uk has kept in contact with three customers on the relevant street cabinets, albeit only those with good lines that already ran at between 50-70Mbps, and all have reported improved download speeds with an increase of around <strong>10-15Mbps+<\/strong>.<\/p>\n<p>Upstream speeds will also benefit, although our group already had close to the headline rate and this made it difficult to know what to expect. Crucially we have no data for longer\/slower lines, which are arguably of much more interest, although Eircom&#8217;s new line profiles for FTTC \/ VDSL Vectoring might offer some hints. Just remember that there are differences between the telecoms platforms but these do appear, at first glance, to be quite similar to the general expectations for vectored FTTC lines.<\/p>\n<blockquote><p><span style=\"color: #339966;\"><strong>Eircom (Ireland) FTTC Vectored Line Profiles<\/strong><\/span><br \/>\n<em>Line Length (max) &#8211; Down (Mbps) &#8211; Up (Mbps)<\/em><br \/>\n300m &#8211; 100 &#8211; 20<br \/>\n450m &#8211; 90 &#8211; 20<br \/>\n525m &#8211; 80 &#8211; 20<br \/>\n600m &#8211; 60 &#8211; 20<br \/>\n750m &#8211; 50 &#8211; 20<br \/>\n850m &#8211; 40 &#8211; 10<br \/>\n1000m &#8211; 30 &#8211; 8<br \/>\n1200m &#8211; 25 &#8211; 8<br \/>\n1300m &#8211; 18 &#8211; 5<br \/>\n1500m &#8211; 15 &#8211; 3<br \/>\n1700m &#8211; 12 &#8211; 1<br \/>\n2000m &#8211; 7 &#8211; 1<\/p><\/blockquote>\n<p>It&#8217;s worth pointing out that some Vectored FTTC lines could go beyond 100Mbps (we&#8217;ve heard of 120-130Mbps being possible), although ISPs tend to like capping a bit below the peak (partly to avoid raising expectations when going mass-market). In any case if something similar to the above is confirmed for the UK then it might mean more people gaining access to &#8220;<em>superfast<\/em>&#8221; (30Mbps+) speeds, which would no doubt be a boost for the Government&#8217;s <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/bduk\" target=\"_blank\">Broadband Delivery UK<\/a> (BDUK) plan (the vast majority of FTTC lines are on a sub-1000m run of copper).<\/p>\n<p>Back in the UK and\u00a0some ISPs have suggested that the number of subscribers achieving the headline rate of 80Mbps has noticeably increased since Vectoring was enabled in related areas, which makes sense given the 10-15Mbps+ speed gains being reported by some.<\/p>\n<p>However Openreach has since clarified to ISPreview.co.uk that vectoring will have the &#8220;<em>most impact<\/em>&#8221; on lines between <strong>50m and 500m<\/strong> (note: most of these might already be getting \u201csuperfast\u201d). But beyond 500m vectoring impact reduces and &#8220;<em>very little gain<\/em>&#8221; was seen past 1.5km, although Openreach did note some limited speed improvements for a few longer lines impacted by cross-talk. It\u2019s important to remember that not even Vectoring can overcome the laws of physics.<\/p>\n<p>As previously expected, Openreach also had to remotely update the firmware for some of their VDSL Modem&#8217;s and a few others needed to be replaced in order to work with Vectoring but the &#8220;<em>majority<\/em>&#8221; were not a problem. However we can see this being more of an issue if people have adopted third-party VDSL routers because some of the early kit doesn\u2019t seem to support Vectoring (note: this won&#8217;t stop vectoring from working for everybody on the cabinet).<\/p>\n<h3><strong><span style=\"color: #339966;\">Trial Phase Two<\/span><\/strong><\/h3>\n<p>So far, so good and Openreach believes that it can push even more performance out of Vectoring. But in order to test that they need to conduct a second trial in the same areas, which we&#8217;re informed will take place during the <strong>summer 2014<\/strong> period and last for around 3 months (possibly longer or shorter) much like the first trial. Note: decisions are yet to be taken on the inclusion of further street cabinets.<\/p>\n<p>The new trial will also include both <strong>Physical Retransmission<\/strong> (<em>G.INP<\/em>) and <strong>Seamless-Rate-Adaptation<\/strong> (<em>SRA<\/em>) technologies, which Openreach said they&#8217;re &#8220;<em>very interested in testing<\/em>&#8221; and see as being useful to help augment the benefits provided by vectoring. Back in 2011 BT ruled out SRA for its older ADSL2+ lines (<a href=\"http:\/\/www.ispreview.co.uk\/story\/2011\/09\/22\/bt-not-implementing-adsl2-broadband-seamless-rate-adaptation-technology.html\" target=\"_blank\">here<\/a>) but it&#8217;s good to see they have plans for it alongside FTTC\/VDSL; SRA does a much faster and more reliable job of varying your line speed depending on its quality.<\/p>\n<p>Openreach also told ISPreview.co.uk that its new trial would evaluate an enhanced vectoring engine (<strong>ASIC<\/strong>), which is &#8220;<em>capable of cancelling out significantly more cross-talk interferes per line<\/em>&#8220;. But contrary to some suggestions BT claims that its plans have &#8220;<em>always<\/em>&#8221; been based around the use of an ASIC vector engine, although outside of the trial they&#8217;re currently said to be determining the potential use of vectoring through &#8220;<em>normal governance processes<\/em>&#8220;. An ASIC version of the hardware instead of FPGA could have implications for the cost of deployment.<\/p>\n<p>Officially no decision has been taken on whether or not to deploy Vectoring across the United Kingdom, although the positive outcome from Openreach&#8217;s first trial suggests that the only real hurdle might end up being the issue of cost. But this could easily be outweighed by a desire to remain competitive with <a href=\"https:\/\/www.ispreview.co.uk\/index.php\/go\/vm\" rel=\"nofollow\" target=\"_blank\">Virgin Media<\/a> and rising expectations from the Government&#8217;s broadband scheme.<\/p>\n<p>Admittedly there are some other problems too, such as the need to replace a small number of VDSL modems and compatibility issues with <strong>Sub Loop Unbundled<\/strong> (SLU) ISPs that use different kit. However SLU providers don&#8217;t cover that many people, especially since Digital Region&#8217;s collapse in South Yorkshire, and new solutions are being explored.<\/p>\n<p>On top of all that, if BT are serious about adopting the next generation of FTTC style technologies (e.g. <strong><a href=\"https:\/\/www.ispreview.co.uk\/index.php\/link\/gfast\">G.fast<\/a><\/strong>) then Vectoring will be essential. Put another way, we wouldn\u2019t bet against Vectoring&#8217;s introduction but the additional trial means it might be 2015 before we see it, but that&#8217;s just our own speculation given the summer start period.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds delivered via BT&#8217;s existing &#8220;up to&#8221; 80Mbps hybrid-fibre (FTTC) superfast broadband network by helping to eliminate interference (crosstalk). But it might also push any future roll-out back to late 2014 or 2015.<\/p>\n","protected":false},"author":1,"featured_media":6641,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[474,55,417,69],"class_list":["post-6640","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uk_isp_news","tag-bt","tag-fttc","tag-g-fast","tag-bt-openreach"],"share_on_mastodon":{"url":"","error":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds - ISPreview UK<\/title>\n<meta name=\"description\" content=\"BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds - ISPreview UK\" \/>\n<meta property=\"og:description\" content=\"BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\" \/>\n<meta property=\"og:site_name\" content=\"ISPreview UK\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ispreview\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/ispreview\" \/>\n<meta property=\"article:published_time\" content=\"2014-05-06T01:08:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2014-05-06T06:24:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/ngg_featured\/fttc_bt_broadband_cabinet_uk_installation.png\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"225\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mark Jackson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ispreview\" \/>\n<meta name=\"twitter:site\" content=\"@ispreview\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Jackson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\"},\"author\":{\"name\":\"Mark Jackson\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/person\\\/de66a8b4e937c21c80e443d1bf9c35d5\"},\"headline\":\"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds\",\"datePublished\":\"2014-05-06T01:08:41+00:00\",\"dateModified\":\"2014-05-06T06:24:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\"},\"wordCount\":1354,\"commentCount\":31,\"publisher\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/ngg_featured\\\/fttc_bt_broadband_cabinet_uk_installation.png\",\"keywords\":[\"BT\",\"FTTC\",\"G.fast\",\"Openreach\"],\"articleSection\":[\"ISP News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\",\"name\":\"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds - ISPreview UK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/ngg_featured\\\/fttc_bt_broadband_cabinet_uk_installation.png\",\"datePublished\":\"2014-05-06T01:08:41+00:00\",\"dateModified\":\"2014-05-06T06:24:07+00:00\",\"description\":\"BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/ngg_featured\\\/fttc_bt_broadband_cabinet_uk_installation.png\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/ngg_featured\\\/fttc_bt_broadband_cabinet_uk_installation.png\",\"width\":300,\"height\":225},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/2014\\\/05\\\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#website\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\",\"name\":\"ISPreview UK\",\"description\":\"Top Broadband ISP and Mobile Provider Information Site\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ispreview.co.uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#organization\",\"name\":\"ISPreview.co.uk\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ispreview_uk_logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ispreview_uk_logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"ISPreview.co.uk\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ispreview\",\"https:\\\/\\\/x.com\\\/ispreview\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/mjack\\\/\",\"https:\\\/\\\/bsky.app\\\/profile\\\/ispreview.bsky.social\",\"https:\\\/\\\/mastodon.social\\\/@ispreview\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/#\\\/schema\\\/person\\\/de66a8b4e937c21c80e443d1bf9c35d5\",\"name\":\"Mark Jackson\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ispreview.co.uk\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/nggallery_import\\\/Mark-Jackson-96x96.jpg\",\"caption\":\"Mark Jackson\"},\"description\":\"By Mark Jackson Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and Linkedin.\",\"sameAs\":[\"http:\\\/\\\/www.ispreview.co.uk\",\"https:\\\/\\\/www.facebook.com\\\/ispreview\",\"https:\\\/\\\/x.com\\\/ispreview\"],\"url\":\"https:\\\/\\\/www.ispreview.co.uk\\\/index.php\\\/author\\\/markj\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds - ISPreview UK","description":"BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html","og_locale":"en_GB","og_type":"article","og_title":"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds - ISPreview UK","og_description":"BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds","og_url":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html","og_site_name":"ISPreview UK","article_publisher":"https:\/\/www.facebook.com\/ispreview","article_author":"https:\/\/www.facebook.com\/ispreview","article_published_time":"2014-05-06T01:08:41+00:00","article_modified_time":"2014-05-06T06:24:07+00:00","og_image":[{"width":300,"height":225,"url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/ngg_featured\/fttc_bt_broadband_cabinet_uk_installation.png","type":"image\/png"}],"author":"Mark Jackson","twitter_card":"summary_large_image","twitter_creator":"@ispreview","twitter_site":"@ispreview","twitter_misc":{"Written by":"Mark Jackson","Estimated reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#article","isPartOf":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html"},"author":{"name":"Mark Jackson","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/person\/de66a8b4e937c21c80e443d1bf9c35d5"},"headline":"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds","datePublished":"2014-05-06T01:08:41+00:00","dateModified":"2014-05-06T06:24:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html"},"wordCount":1354,"commentCount":31,"publisher":{"@id":"https:\/\/www.ispreview.co.uk\/#organization"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage"},"thumbnailUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/ngg_featured\/fttc_bt_broadband_cabinet_uk_installation.png","keywords":["BT","FTTC","G.fast","Openreach"],"articleSection":["ISP News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html","url":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html","name":"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds - ISPreview UK","isPartOf":{"@id":"https:\/\/www.ispreview.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage"},"thumbnailUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/ngg_featured\/fttc_bt_broadband_cabinet_uk_installation.png","datePublished":"2014-05-06T01:08:41+00:00","dateModified":"2014-05-06T06:24:07+00:00","description":"BTOpenreach has decided to extend their on-going trials of VDSL Vectoring (ITU-T G.993.5) technology into a second phase, which could improve the speeds","breadcrumb":{"@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#primaryimage","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/ngg_featured\/fttc_bt_broadband_cabinet_uk_installation.png","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/ngg_featured\/fttc_bt_broadband_cabinet_uk_installation.png","width":300,"height":225},{"@type":"BreadcrumbList","@id":"https:\/\/www.ispreview.co.uk\/index.php\/2014\/05\/bt-prepare-phase-2-vectoring-trials-boost-uk-fttc-broadband-speeds.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ispreview.co.uk\/"},{"@type":"ListItem","position":2,"name":"BT Prepare Phase 2 Vectoring Trials to Boost UK FTTC Broadband Speeds"}]},{"@type":"WebSite","@id":"https:\/\/www.ispreview.co.uk\/#website","url":"https:\/\/www.ispreview.co.uk\/","name":"ISPreview UK","description":"Top Broadband ISP and Mobile Provider Information Site","publisher":{"@id":"https:\/\/www.ispreview.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ispreview.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.ispreview.co.uk\/#organization","name":"ISPreview.co.uk","url":"https:\/\/www.ispreview.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2020\/07\/ispreview_uk_logo.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2020\/07\/ispreview_uk_logo.jpg","width":1000,"height":1000,"caption":"ISPreview.co.uk"},"image":{"@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ispreview","https:\/\/x.com\/ispreview","https:\/\/www.linkedin.com\/in\/mjack\/","https:\/\/bsky.app\/profile\/ispreview.bsky.social","https:\/\/mastodon.social\/@ispreview"]},{"@type":"Person","@id":"https:\/\/www.ispreview.co.uk\/#\/schema\/person\/de66a8b4e937c21c80e443d1bf9c35d5","name":"Mark Jackson","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","url":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","contentUrl":"https:\/\/www.ispreview.co.uk\/wp-content\/uploads\/2023\/01\/nggallery_import\/Mark-Jackson-96x96.jpg","caption":"Mark Jackson"},"description":"By Mark Jackson Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and Linkedin.","sameAs":["http:\/\/www.ispreview.co.uk","https:\/\/www.facebook.com\/ispreview","https:\/\/x.com\/ispreview"],"url":"https:\/\/www.ispreview.co.uk\/index.php\/author\/markj"}]}},"_links":{"self":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/6640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=6640"}],"version-history":[{"count":0,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/6640\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/media\/6641"}],"wp:attachment":[{"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=6640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/categories?post=6640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ispreview.co.uk\/index.php\/wp-json\/wp\/v2\/tags?post=6640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}