CityFibre (via VolkerSmart) are building in my area (West Ipswich), and I've been lettered/leafleted that they'll be passing my house within the next week.
Just curious if anybody has any insight or experience as to the timeline from build, to handover back to CityFibre, to a connection being ISP orderable?
Trying to avoid tying myself into another 12-18 month G.fast contract if I have a realistic prospect of getting FTTP within the next 6 or so months, but not had a lot of luck searching around for indicitive answers.
Many thanks!
CityFibre (via VolkerSmart) are building in my area (West Ipswich), and I've been lettered/leafleted that they'll be passing my house within the next week.
Just curious if anybody has any insight or experience as to the timeline from build, to handover back to CityFibre, to a connection being ISP orderable?
Trying to avoid tying myself into another 12-18 month G.fast contract if I have a realistic prospect of getting FTTP within the next 6 or so months, but not had a lot of luck searching around for indicitive answers.
Many thanks!