Paddy in Wales
Member
We (our CFP) are expecting to dig our own trench for about 3 miles for OpenReach to install FTTC. Do OR have to be present to feed in the cable, do we leave the trench open for them to lay later, or do we lay ducting?
Thanks
Paddy
Thanks
Paddy