I've been following Community fibre build in Grange Hill and surrounding area and it seems that the rollout can be as quick as 4 months.
1st signs that residents will spot will be the black enclosures hanging half way up the telephone poles
Spotted the cabinet being built early September and the telephone poles being populated with AFN's late September.
Letter drop to the local area in early December and finally allowing to book late January.
Been a month now and overall very happy-
From writing to and receiving a response from the CEO the very next day to dealing with their technical department (using own equipment) I can't fault their service.
[admin note: referral links are not allowed - removed]

1st signs that residents will spot will be the black enclosures hanging half way up the telephone poles
Spotted the cabinet being built early September and the telephone poles being populated with AFN's late September.
Letter drop to the local area in early December and finally allowing to book late January.
Been a month now and overall very happy-
From writing to and receiving a response from the CEO the very next day to dealing with their technical department (using own equipment) I can't fault their service.