Moved house in July to find whilst half mile away our FTTC install was about 65Mbps since 2015, here it was under 10Mbps down and 0.2 up & was unusable so we cancelled the BT line.
I spoke to the local BDUK group & they said contracts had just been signed to sort it by March 2020. So was looking at local poles shortly after & lo what do I see CBT & rolls of fibre ready to be back connected to previous poles along with caution overhead fibre signs on the poles.
There are 2 CBT's 3 poles apart & once it gets back to the main road it goes underground. I don't know when these went in & the Openreach checker says "coming soon" for our post code & 3/4 others rest if village just says no.
I checked with Openreach on twitter & they said not coming until 2021 which I'm hoping is the install date for the rest of the village as there's only about 4 post codes getting FTTP at the moment as far as I can see.
Does anyone have any idea on how to garner any further information at this time? There's nothing in roadworks.org but then I guess there wouldn't need to be as they wouldn't need road closures to push the stuff underground & then across half dozen poles esp as its super rural quiet villages roads.
So I guess does anyone have any ideas how long this is likely to take? Aside from saying March lol. I was surprised to see the equipment on the poles already so wondered if that has any bearing on lead time?
Anyones thoughts?
I spoke to the local BDUK group & they said contracts had just been signed to sort it by March 2020. So was looking at local poles shortly after & lo what do I see CBT & rolls of fibre ready to be back connected to previous poles along with caution overhead fibre signs on the poles.
There are 2 CBT's 3 poles apart & once it gets back to the main road it goes underground. I don't know when these went in & the Openreach checker says "coming soon" for our post code & 3/4 others rest if village just says no.
I checked with Openreach on twitter & they said not coming until 2021 which I'm hoping is the install date for the rest of the village as there's only about 4 post codes getting FTTP at the moment as far as I can see.
Does anyone have any idea on how to garner any further information at this time? There's nothing in roadworks.org but then I guess there wouldn't need to be as they wouldn't need road closures to push the stuff underground & then across half dozen poles esp as its super rural quiet villages roads.
So I guess does anyone have any ideas how long this is likely to take? Aside from saying March lol. I was surprised to see the equipment on the poles already so wondered if that has any bearing on lead time?
Anyones thoughts?