I sent a query asking about the Brookend build via the Fastershire website using a different e-mail address to my usual one, and they have replied:

"Gigaclear have been undertaking a redesign of the Lot 2/3c plan over the last few months and the main result of this has been a reconfiguration of their cabinet areas with some changing name, size and shape.
In general, the rollout in Forest of Dean is ongoing and to date, has largely concentrated in and around Tibberton, Highnam, Upleadon, Littledean and Cinderford, but a secondary backhaul access has been connected at Beachley to enable Gigaclear to work from south to north as well.
As a result of the redesign we now understand that your property will be connected via POT 313 to the ‘Stroat Chepstow (South West)’ cabinet. Fastershire is now working with Gigaclear to update the Fastershire website with this latest information as soon as possible. However, the new design predicts a build start of June 2020 for this cabinet."

It will be interesting to see the new reconfigured areas, and whether the build really does start in June. Even if it does I expect that the build will be finished about the same time as I retire and no longer need superfast broadband.
 
Last edited:

Kensta

Casual Member
They have come back via email.

I don't have any dates, just "please keep an eye on the website", but have been given POT number 0617 in the "new network build area now known as Huntley, Gloucester (South West)."
 

sheephouse

Pro Member
That's interesting. It seems they are changing a lot of the areas - I can't say that I'm comforted by them changing their plans radically after 3 years. They were due to deliver new plans by the end of Jan 2019, and I'm guessing those plans are finally (almost?) ready.
They still have works listed on one.network around Mitcheldean until mid May, but I can't see any other works that would suggest anything else is going to happen anytime soon.
 

sheephouse

Pro Member
It's always good to see some progress. There is more work shown on one.network around Longhope and Mitcheldean until May, but I can't find any other work planned after that.
 

sheephouse

Pro Member
Well, another six weeks with little change - there are still works shown around Mitcheldean until mid-June, but nothing I can find anywhere else.
My local Parish Council has had no notification of any work (it is a contractual obligation that Parish Councils are advised some weeks before work commences).
However, Fastershire have now put their Broadband Strategy 2019-2022 document online. It has been reformatted a little since the draft from Dec 2019, but I've not found any substantive changes.
The Fastershire checker still says work in my area will start Q1 2020, which may well still happen as soon as they develop a time machine.
 

sheephouse

Pro Member
I had a response from Fastershire today - they have updated their address checker with the latest dates from Gigaclear. Many of the areas have changed - My property has moved from "Brookend" to "Stroat Chepstow" with a start date of Q3 2020. That ties in with the last info I had from Fastershire, but contradicts the info from Gigaclear when I spoke to them a couple of weeks ago - they hadn't heard of the "Stroat Chepstow" area, and claimed I was still in "Brookend", and that the plans were still in design and would go to the validation stage sometime. Gigaclear's website still shows the originally planned areas.
Nothing showing on one.network though (cutting it fine for a Q3 start!) - only works continuing around Mitcheldean until the end of July.
 

Kensta

Casual Member
We have a build start of Q1 2021 now on the Fastershire website, in “Huntley” area.

... ah well, just committed to another 12 months of 4G so hopefully a good chance of switching over then and not paying twice.
 

sheephouse

Pro Member
I notice that some Gigaclear works to the west of Coleford have now appeared on one.network. Still nothing south of Coleford at all.
 

sheephouse

Pro Member
Today I noticed that a lot of planned works have appeared in Beachley, Sedbury and Tutshill for Nov & Dec. These areas were due to start Q1 2021, so it looks as if they will start a little early.
However, there is nothing for my area (Stroat) which is due to start Q3 2020. I spoke to build care, and they confirmed that there is currently no work planned in my area for this year.
I assume that once the Tutshill build is complete they will start the neighboring Woodcroft area, and after that the Stroat area - so I expect the build in my area to start Q2/Q3 2021.
 

sheephouse

Pro Member
Planned works for the Woodcroft are have now appeared on one.network for the period 4thJan to 4th Feb 21. This area is listed on Fastershire's website as due to start on Q2 2020, so looks to be another 9 month slip from the published dates.
 
Top
Promotion
Cheapest Superfast ISPs
  • Hyperoptic £22.00
    Avg. Speed 50Mbps, Unlimited
    Gift: None
  • Onestream £22.49 (*29.99)
    Avg. Speed 45Mbps, Unlimited
    Gift: None
  • xln telecom £22.74 (*47.94)
    Avg. Speed 66Mbps, Unlimited
    Gift: None
  • Plusnet £22.99 (*35.98)
    Avg. Speed 36Mbps, Unlimited
    Gift: £50 Reward Card
  • Vodafone £23.00
    Avg. Speed 35Mbps, Unlimited
    Gift: None
Prices inc. Line Rental | View All
Helpful ISP Guides and Tips
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
»
Promotion
The Top 20 Category Tags
  1. BT (2768)
  2. FTTP (2746)
  3. FTTC (1783)
  4. Building Digital UK (1740)
  5. Politics (1662)
  6. Openreach (1619)
  7. Business (1429)
  8. FTTH (1340)
  9. Statistics (1240)
  10. Mobile Broadband (1221)
  11. Fibre Optic (1062)
  12. 4G (1052)
  13. Wireless Internet (1020)
  14. Ofcom Regulation (1014)
  15. Virgin Media (1004)
  16. EE (696)
  17. Sky Broadband (668)
  18. Vodafone (666)
  19. TalkTalk (661)
  20. 5G (514)
Sponsored

Copyright © 1999 to Present - ISPreview.co.uk - All Rights Reserved - Terms  ,  Privacy and Cookie Policy  ,  Links  ,  Website Rules