Now we have this dedicated forum I wonder whether anyone else would like to comment on any progress being made by Gigaclear in the Fastershire areas? I'm in Lot 3c in the Brookend section, and the current start date is currently given as Q1 2020 (originally it was due to be complete last year).
There is no visible plan now, just a postcode checker. I am aware of work in progress between Chaxhill and Westbury-on-Severn, but I believe that they should have extended out by now if they are to reach other areas on time (my area is among the furthest from their current network, so needs all the intervening areas to be completed before my area can be connected).
Is anyone in an area that is being worked on? Is anyone in an area that isn't being worked on but should be according to the postcode checker?
At present I (still) have no confidence of the current plan providing me with FTTP within 2-3 years.
There is no visible plan now, just a postcode checker. I am aware of work in progress between Chaxhill and Westbury-on-Severn, but I believe that they should have extended out by now if they are to reach other areas on time (my area is among the furthest from their current network, so needs all the intervening areas to be completed before my area can be connected).
Is anyone in an area that is being worked on? Is anyone in an area that isn't being worked on but should be according to the postcode checker?
At present I (still) have no confidence of the current plan providing me with FTTP within 2-3 years.