Recently I've been seeing engineers pulling fibre through ducting and attaching CBTs to the top of poles opposite my street (only houses on one side), in what I assume is part of an FTTP rollout as a result of USO. However, no details of the installation appear on Openreach's website or the DSLChecker and was wondering how often users usually have to wait before FTTP is available to order after this stage?
(I also noted that engineer appointments are being delayed till after 1st March however we also have well under the 30mbps catchment clause so I am also unaware how that works or impacts the timeline)
Thanks
(I also noted that engineer appointments are being delayed till after 1st March however we also have well under the 30mbps catchment clause so I am also unaware how that works or impacts the timeline)
Thanks