I realize this is probably a "How long is a piece of string" type of question but I'm interested to know any examples of the time between gigaclear putting the duct to the edge of your premises and being able to place an order/get installed?
They've started the civils along the road from me and according to roadworks.org should be completing the village by mid September. The next village along already has live service and I think we'll be connected to the same main cabinet so I'm assuming its just a case of having the path the blow the physical fibre back to the cab? They also seem to be installing some smaller green cabs that are about 50cm tall which I'm guessing are some sort of patch point to connect onto a fibre back to the switches in the main cab.
Do gigaclear tend to open up ordering for an address as soon as its built or do they wait for a whole village to be completed first?
They've started the civils along the road from me and according to roadworks.org should be completing the village by mid September. The next village along already has live service and I think we'll be connected to the same main cabinet so I'm assuming its just a case of having the path the blow the physical fibre back to the cab? They also seem to be installing some smaller green cabs that are about 50cm tall which I'm guessing are some sort of patch point to connect onto a fibre back to the switches in the main cab.
Do gigaclear tend to open up ordering for an address as soon as its built or do they wait for a whole village to be completed first?