Home
 » ISP News » 

SpaceX to Test Gen v3 Starlink Broadband Satellites on Next Starship Launch

Monday, Jul 13th, 2026 (5:22 pm) - Score 40
Starlink-v3-Broadband-Satellite-Comparison

SpaceX has revealed that the next test launch of their future Starship rocket (flight 13), which is scheduled to take place on Thursday night this week (occurring after 23:45), will attempt to deploy 20 of their next generation V3 (GEN3) Starlink broadband satellites “for the first time” (these will not be dummy demonstrators like before). But they’ll only last a few minutes.

The service currently has around 10,800 satellites in Low Earth Orbit (LEO) – mostly at altitudes of between c.340-550km. Residential customers in the UK currently pay from £40 a month for the Residential 100Mbps unlimited data plan (plus £10pm for the hardware), which also promises uploads of c.15-35Mbps and low latency connectivity (c.20ms). Faster packages exist at greater cost, while more restrictive (data capped) options also exist for roaming users (e.g. £55 per month for 100GB of data).

NOTE: Starlink’s network currently has 12 million customers (up from 6m in July 2025). The service had 110,000 customers in the UK as of July 2025 (up from 87,000 in 2024) – mostly in rural areas.

However, as we’ve previously reported, SpaceX are aiming to deliver a significant upgrade to the performance and capacity of their Starlink constellation by putting the next generation of v3 satellites into orbit in the future. Each v3 will be able to handle 1 Terabit per second (1000Gbps) of downlink (up from 96Gbps on V2 Mini) and 160Gbps of uplink speed (shared capacity), with the future Starship rocket able to put around 60 of these into orbit per launch (here).

Advertisement

The problem is that SpaceX are currently unable to properly launch any of their new v3 satellites, which is because they’re too large and heavy (2,000kg each vs 575kg for V2 Mini) for that to be economically viable via their existing Falcon 9 rockets. SpaceX has thus had to wait for their new heavy lift Starship rocket to be ready, but these have yet to reach full orbit and the same will be true for their next launch on 16th July 2026.

Despite this, the launch schedule for flight 13 says that a total of 20 V3 Starlinks will be on board the next Starship test flight, yet bizarrely these are all “expected to demise upon re-entry approximately 20 minutes after deployment“. Talk about an exercise in throwing money out of a window space door.

SpaceX Statement

The Starship upper stage’s primary objectives include the deployment of 20 Starlink V3 satellites, a relight of a single Raptor engine while in space, and another controlled entry, descent, and splashdown in the Indian Ocean. There have also been several modifications to Starship’s propulsion system to address the engine out issue experienced on the previous flight.

Approximately 40 seconds after stage separation, Starship lost one of its three Raptor vacuum optimized engines. The vehicle was able to demonstrate its engine out capability and reach its planned suborbital trajectory. Several hardware and operational modifications have been made to address the interconnected causes with additional reliability improvements planned in upcoming versions of the Raptor engine.

For the first time, Starship will carry V3 Starlink satellites to space, which aim to greatly expand the network’s capacity and user speeds. As part of this initial test, Starship is planned to deploy 20 satellites which will extend solar arrays and antennas and will attempt to connect with the larger Starlink constellation via high-capacity lasers. The Starlink satellites will be on the same suborbital trajectory as Starship and are expected to demise upon re-entry approximately 20 minutes after deployment.

Six of the satellites have been modified with a suite of cameras to scan Starship’s heat shield and transmit imagery down to operators to continue testing methods of analyzing Starship’s heat shield readiness for return to launch site on future missions. Several tiles on Starship have been painted white to simulate missing tiles and serve as imaging targets in the test.

Several upgrades and experiments related to Starship’s heatshield will also be tested to continue iteration towards a fully and rapidly reusable design. Multiple tiles will be attached to the metallic side of Starship’s aft flaps along with modified tiles and attachment mechanisms in the heatshield covering the aft skirt to gather flight data on different attachment options. Finally, Starship’s heatshield will have load sensing tiles to take measurements as the vehicle experiences higher dynamic pressure on ascent than previous flights, putting added stress on the tile attachments in exchange for increased payload to orbit capability.

On the surface it might seem like a waste of money to allow 20 next generation broadband satellites to burn up like this, but the test data and camera feeds they’ll carry could yet be worth the cost. Crucially, if SpaceX can make this flight a success, then the next Starship rocket launch may well attempt to reach a full orbital trajectory and that would mark a crucial milestone toward commercial operation.

Share with Twitter
Share with Linkedin
Share with Facebook
Share with Reddit
Share with Pinterest
Tags:
Mark-Jackson
By Mark Jackson
Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and .
Next Article
Search ISP News
Search ISP Listings
Search ISP Reviews

Leave a Reply

Your email address will not be published. Required fields are marked *

NOTE: Your comment may not appear instantly (it may take several hours) due to static caching and moderation checks by the anti-spam system. Please be patient. We will reject comments that spam, troll, post via known fake IP/proxy servers or fall foul of our Online Safety and Content Policy.
Javascript must be enabled to post (most browsers do this automatically)

Privacy Notice: Please note that news comments are anonymous, which means that we do NOT require you to enter any real personal details to post a message and display names can be almost anything you like (provided they do not contain offensive language or impersonate a real person's legal name). By clicking to submit a post you agree to storing your entries for comment content, display name, IP and email in our database, for as long as the post remains live.

Only the submitted name and comment will be displayed in public, while the rest will be kept private (we will never share this outside of ISPreview, regardless of whether the data is real or fake). This comment system uses submitted IP, email and website address data to spot abuse and spammers. All data is transferred via an encrypted (https secure) session.
Cheap BIG ISPs for 100Mbps+
Community Fibre UK ISP Logo
100Mbps
Gift: None
Plusnet UK ISP Logo
Plusnet £22.99
145Mbps
Gift: £155 Reward Card
Sky UK ISP Logo
Sky £23.00
100Mbps
Gift: None
NOW UK ISP Logo
NOW £23.00
100Mbps
Gift: None
BT UK ISP Logo
BT £23.99
150Mbps
Gift: £100 BT Reward Card
Large Availability | View All
Promotion
Cheap Unlimited Mobile SIMs
giffgaff UK ISP Logo
giffgaff £14.00
Contract: 18 Months
Data: Unlimited
iD Mobile UK ISP Logo
iD Mobile £16.00
Contract: 1 Month
Data: Unlimited
Talkmobile UK ISP Logo
Talkmobile £16.95
Contract: 1 Month
Data: Unlimited
Smarty UK ISP Logo
Smarty £17.00
Contract: 1 Month
Data: Unlimited
Sky UK ISP Logo
Sky £20.00
Contract: 12 Months
Data: Unlimited
Cheapest ISPs for 100Mbps+
Community Fibre UK ISP Logo
100Mbps
Gift: None
Gigaclear UK ISP Logo
Gigaclear £19.00
300Mbps
Gift: None
toob UK ISP Logo
toob £19.50
150Mbps
Gift: None
Grain Connect UK ISP Logo
250Mbps
Gift: None
Zzoomm UK ISP Logo
Zzoomm £21.00
200Mbps
Gift: None
Large Availability | View All
Promotion
Sponsored

Copyright © 1999 to Present - ISPreview.co.uk - All Rights Reserved - Terms , Privacy and Cookie Policy , Links , Website Rules , Contact