
At present Openreach (BT) already provides their Gigabit-capable Fibre-to-the-Premises (FTTP) broadband ISP network to UK new build home developments of 30+ plots for free, while smaller builds could only get a discount. The good news is that they’ve today extended this free build offer to new sites of just 20+ plots.
The move is all part of the operator’s “Fibre First” effort to help achieve their current goal of putting “full fibre” connectivity within reach of 4 million UK premises by March 2021 (here), which is expected to be followed by their ambition for achieving 15 million premises passed by around 2025 and then possibly the “majority” of the United Kingdom at a later date.
Naturally it’s always cheapest to do such work at the early stages of a new development, although there are quite a few sites that still fall into the smaller category. In response Openreach have now dropped the threshold for free eligibility from 30 to 20 homes.
Advertisement
On top of that the network access provider has also capped the amount that UK house builders contribute if they ask Openreach to build FTTP to smaller-scale developments of just 2 and 3 premises (cap is set at £2,000), which should help to encourage take-up. You can see the rate card for all this at the bottom of our article.
Overall more than 13,000 new homes across around 600 small housing developments per annum stand to benefit from the 20+ plots change and Openreach plans to drive take-up of FTTP by developers on these smaller developments from its current level of 45% to 100%.
Otherwise the programme appears to have been quite successful with 99% of plots on sites of 30 or more homes registering for FTTP. In fact since launching in 2016 the operator has connected 354,000 new build homes with FTTP and this financial year alone they’ve built 125,000 new build premises (around 3.5k new premises every week) and are on target to reach 175,000 by the end of the fiscal year (April 2020).
Kim Mears OBE, Openreach’s MD Strategic Infrastructure Development, said:
“Our existing offer already provides huge benefits to both buyers and builders alike, but we want to go further and make sure everybody moving into a new build property can enjoy the advantages of Full Fibre broadband.
The UK is a world leader in digital infrastructure and services today, but as the digital revolution continues at an ever increasing pace, and our demand for data grows, we need to make sure this country stays ahead of the curve by building fast, reliable networks that cater for all the activities we’ll want to do online in the decades ahead.
We hope these new measures will provide the necessary incentive for housebuilders to adopt this future-proof technology across smaller developments so that no-one’s left behind.
We welcome the government’s intention – outlined in the Queen’s Speech – to amend legislation so that all new build homes are required to have the infrastructure to support gigabit-capable connections, and we will work closely with government and housebuilders on how best to deliver this.”
The lower build threshold is due to take effect on 1st April 2020 and developers of such sites can register their interest (here). Now here’s how Openreach’s new build rate / cost card looks following the above changes and the addition of a £2k price cap.
Advertisement

Some readers may also recall that Openreach stopped fitting copper services to any larger sized developments (30 plots or more) in April last year (here) and thus we’ve asked whether today’s announcement means this policy has also now been adjusted down to 20+ plots, which could catch some developers by surprise. We’ll report back when we get a response.
Otherwise plenty of past studies have indicated that a good broadband connection is a key consideration for new house buyers and thus the ability to say they’re equipped for “full fibre” is not to be underestimated.
UPDATE 2:01pm
Advertisement
Openreach confirms that alongside today’s announcement they won’t be fitting copper for any new build sites of 20 plots or more. The one exception is that they would only agree to installing residual amounts of copper for legacy service type lines, such as lifts/alarm panels etc. where the developer doesn’t have a fibre/IP based solution.
Comments are closed