Home
 » ISP News » 
Sponsored Links

Openreach Takes on Project Gigabit Broadband Contract for Derbyshire Peak District

Friday, Apr 10th, 2026 (2:36 pm) - Score 120
2024-Openreach-engineers-working-on-fibre-node-PR

The Government’s Building Digital UK (BDUK) agency has today confirmed that the previously stalled Project Gigabit broadband roll-out contract for the Peak District (Lot 3.01), which was originally held by FullFibre Limited until they “mutually agreed to terminate” it in May 2025 (here), has now been picked up by Openreach (BT).

Just to recap. The contract was originally valued at £10.7m (public subsidy) and aimed to extend gigabit-capable broadband connectivity to cover 4,400 premises in hard-to-reach areas, including locations such as Matlock, Birchover, Buxton, Ashover and communities in the Hope Valley (here). But this was sent into limbo after the contracted supplier pulled out just as the build phase was supposed to start.

NOTE: Project Gigabit aims to help extend gigabit broadband (1000Mbps+) ISP networks to “nationwide” coverage (c.99% of UK premises) by 2032, focusing mostly on the final 10-20% in hard-to-reach areas. Some 90% of premises can already access such a network (here) and Ofcom forecast this could reach up to 97% by January 2028 (here).

At the time a spokesperson for BDUK told ISPreview that they were “now moving swiftly to put in place alternative plans with other suppliers to connect premises that were due to be covered by this contract“. Sadly FullFibre Limited declined to comment, although smaller altnets are known to be under a lot of strain from high interest rates, rising build costs and competition etc.

Advertisement

Fast-forward to today and the good news is that BDUK have now agreed a contract change with Openreach to include these premises within their existing Call-Off 1 contract under their Single Supplier Framework agreement – now valued at c.£1.2bn, which is focused on Cross-Regional (Type C) procurements (no other suppliers currently tackle Type C).

Type C typically reflects remote areas where no or no appropriate market interest has previously been expressed before to BDUK, or areas that have been descoped or terminated from a prior procurement. Such areas are often skipped due to being too expensive (difficult) for smaller suppliers to tackle. Openreach have already taken on deployments for other contracts that fell into similar difficulties with different altnets (examples here and here).

At the time of writing there’s currently no detail on whether there will be any changes to the original deployment plan or scope for Lot 3.01 as a result of this change. The BDUK statement simply says: “In April 2026 BDUK agreed a contract change with Openreach to include the Derbyshire Peak District area within the existing Project Gigabit contract (call-off one), which covers parts of Staffordshire.”

Share with Twitter
Share with Linkedin
Share with Facebook
Share with Reddit
Share with Pinterest
Mark-Jackson
By Mark Jackson
Mark is a professional technology writer, IT consultant and computer engineer from Dorset (England), he also founded ISPreview in 1999 and enjoys analysing the latest telecoms and broadband developments. Find me on X (Twitter), Mastodon, Facebook, BlueSky, Threads.net and .
Next Article
Search ISP News
Search ISP Listings
Search ISP Reviews
Comments
1 Response

Advertisement

  1. Avatar photo HR2Res says:

    Good for Lot 3.01 then. Hopefully, news on Lot 15 won’t be far behind then, seeing as FullFibre pulled out of both contracts at the same time.

Leave a Reply

Your email address will not be published. Required fields are marked *

NOTE: Your comment may not appear instantly (it may take several hours) due to static caching and moderation checks by the anti-spam system. Please be patient. We will reject comments that spam, troll, post via known fake IP/proxy servers or fall foul of our Online Safety and Content Policy.
Javascript must be enabled to post (most browsers do this automatically)

Privacy Notice: Please note that news comments are anonymous, which means that we do NOT require you to enter any real personal details to post a message and display names can be almost anything you like (provided they do not contain offensive language or impersonate a real person's legal name). By clicking to submit a post you agree to storing your entries for comment content, display name, IP and email in our database, for as long as the post remains live.

Only the submitted name and comment will be displayed in public, while the rest will be kept private (we will never share this outside of ISPreview, regardless of whether the data is real or fake). This comment system uses submitted IP, email and website address data to spot abuse and spammers. All data is transferred via an encrypted (https secure) session.
Cheap BIG ISPs for 100Mbps+
Community Fibre UK ISP Logo
200Mbps
Gift: None
Youfibre UK ISP Logo
Youfibre £20.00
200Mbps
Gift: None
Sky UK ISP Logo
Sky £23.00
100Mbps
Gift: None
Plusnet UK ISP Logo
Plusnet £23.99
145Mbps
Gift: £90 Reward Card
Virgin Media UK ISP Logo
Virgin Media £23.99
132Mbps
Gift: None
Large Availability | View All
Promotion
Cheap Unlimited Mobile SIMs
iD Mobile UK ISP Logo
iD Mobile £16.00
Contract: 24 Months
Data: Unlimited
Talkmobile UK ISP Logo
Talkmobile £16.95
Contract: 1 Month
Data: Unlimited
Smarty UK ISP Logo
Smarty £18.00
Contract: 1 Month
Data: Unlimited
O2 UK ISP Logo
O2 £21.24
Contract: 24 Months
Data: Unlimited
Sky UK ISP Logo
Sky £22.00
Contract: 12 Months
Data: Unlimited
New Forum Topics
By: The Wee Bear
By: Brava210
By: MissTuned
By: The Wee Bear
Cheapest ISPs for 100Mbps+
Gigaclear UK ISP Logo
Gigaclear £16.00
300Mbps
Gift: None
Community Fibre UK ISP Logo
200Mbps
Gift: None
toob UK ISP Logo
toob £19.50
150Mbps
Gift: None
Youfibre UK ISP Logo
Youfibre £20.00
200Mbps
Gift: None
Beebu UK ISP Logo
Beebu £23.00
100 - 160Mbps
Gift: None
Large Availability | View All
Promotion
Sponsored

Copyright © 1999 to Present - ISPreview.co.uk - All Rights Reserved - Terms , Privacy and Cookie Policy , Links , Website Rules , Contact