A debate over costs between
B4RN (Broadband 4 Rural North), which wants to run its “hyperfast” 1000Mbps (Megabits) capable fibre optic broadband (
FTTH) cable over a railway bridge (viaduct) that crosses the River Lune in North Lancashire (England), and the state-owned
Network Rail is threatening to delay the project.